CellOSIRENA · cell engineering OSOptics acceptance test awaitedRobot live (simulated)
Sample journey

Simulated deck your own copy for 30 minutes

Command

CellOS · IRENA cell OS

Design a cell programme, translate it onto the Prepaire BSL-3 robot, and run coat⁠–⁠seed⁠–⁠feed⁠–⁠image⁠–⁠passage as one identity‑safe loop. The first acceptance test runs seven days of the WTC11 cycle.

The deck photographs below are the IRENA workcell in Masdar.

IRENA dual-gantry workcell and NeXCell incubator inside the glass isolator
Status: Simulated dataRobot live (simulated)

Deck · simulated telemetry

IRENA BSL-3 · Masdar

Dual gantry, plate nests and NeXCell incubator. SAT-7 · WTC11 feeder-free cycle

Temp
37.06 °C
CO₂
4.99%
RH
93%
Envelope · site setting
BSL-3 released

Operator pack

The as-built PDF brochure of the Masdar workcell (v1.0, 22 Sep 2026). The Word technical documentation describes an earlier CellOS installation and is held back until it is rewritten for VERA.

IRENA-BIO-SOP-001 · day 3

First acceptance run

The SAT-7 demonstration run

Seven days of the WTC11 feeder-free cycle on the deck: coat, seed, feed, image, passage and export, as one reconstructable batch. Day 3: Watch confluence.

Status: Simulated data

  1. D0
    Coat + seed
  2. D1
    Image and feed
  3. D2
    Trajectory
  4. D3 · today
    Watch confluence
  5. D4
    Passage A / B
  6. D5
    Recovery
  7. D6
    Daily loop
  8. D7
    Export SAT

Differentiated area <5% green; 5–10% yellow; >10% red.

Live run

SAT-7 · WTC11 feeder-free cycle

IRENA-BIO-SOP-001 · day 3 · Image and feed

RunningStatus: Simulated data
6-well · SBSIRENA-PLT-0147
Well A1GREEN
Confluence
72.0%
Diff. area
1.8%
Viability
93.0%
Residual iPSC
0.30%

Mean confluence · 74%

Open run console

Interlocks

Status: Simulated data
  • Identity chainPlate IRENA-PLT-0147 matches incubator slot C3.OK
  • Run holdNo run on hold.OK
  • Incubator37.06 °C · 4.99% CO₂ · 93% RH.OK
  • OpticsInline imager acceptance test awaited. Classifier advisory only.GAP
  • Waste / tipsWaste bottle 48 of 2,000 mL · 1,256 filtered tips left. Counted from the liquid-handling steps the runs here have started.OK
  • BSL-3 envelopeSet by the site: room released.Setting
  • Laser armDisarmed. Two-role authorisation required.OK

Sidecar jobs

  • Parr N₂ cavitationVES-0144On the instrument
  • AO/PI cassette counterTUB-SAT7-BQueued
  • EasySep CD14TUB-CD14-03Queued
  • LSRFortessa-classPLT-V96-22Queued

Current method

6.2b · Imager + pipette

Classifier confluence / morphology; feed

Green feed; yellow review

Event log

  • 18:42:11 GSTB3 differentiated area 6.0%: advisory hold on autonomous passage.
  • 18:42:00 GSTDay 3 image: 5 of 6 wells GREEN; B3 YELLOW (edge merge).
  • 09:58:40 GSTDay 2 feed complete.
  • 08:12:00 GSTDay 1 whole-well images exported. Mean confluence 28%.
  • 08:14:21 GSTVitronectin coating complete · no dry-well flag.
  • 08:12:04 GSTRun SAT-7 released. WTC11 P18 identity matched.
CellOS · Prepaire Labs · IRENA BSL-3, MasdarStatus: Gantry link simulatedInc 37.06 °C / 4.99% CO₂ / 93% RH (simulated)Research use · not a clinical release system

Demonstration copy