Production Readiness
Checklist: PREPAIRE-LIM-GO-LIVE@3.0.0
Baseline status: NOT APPROVED FOR PATIENT ACTIVATION
This checklist is fail-closed. A checked infrastructure box does not approve an assay, instrument, software build, or clinical use.
Critical inventory blockers
- Resolve the workbook classification of Roche cobas i 601 as a mass spectrometer; physically confirm model/module, serial, software, middleware, and intended assay menu.
- Read the serials of the Sysmex urine-line modules (UC-3500 CP-SU-000001, UF-5000 CP-SU-000002, UD-10 SU-000001) and the U-WAM version; record the UD-10's room.
- Add missing serials for SCIEX ZenoTOF 8600, Sysmex XR-1000 (SRA-SXA-000001, with its IPU version), Sysmex CS-1600 (CP-SC-000001, nameplate model unresolved), and any other unassigned item before activation.
- Resolve duplicate serials, inconsistent manufacturer names, and malformed asset identifiers.
- Requalify inactive instruments before any patient run.
- Receive, install, qualify, and inventory the planned SCIEX instrument before connector activation.
Instrument package
- physical identity photographed and reconciled
- serial, firmware, software, patch, controller/workstation, timezone
- assay/method and version
- vendor export/interface guide for exact release
- native evidence and retention/cleanup behaviour
- open derivative and converter
- service and calibration state
- operator roles
- network diagram and ports
- local extraction fixtures
- signed acceptance report
- append-only quality activation approval for exact assay/version
- append-only laboratory-director activation approval by a different identity
LIM package
- field dictionary and pseudonym rules
- work-order state diagram
- OIDC client and mTLS
- durable outbox/replay
- event idempotency
- cancellation/quarantine
- amended result behaviour
- reconciliation report
- operational ownership and escalation
Infrastructure
- managed Postgres, encryption, PITR, monitoring, restore test
- object bucket versioning
- compliance object lock and retention
- KMS key policy, rotation, break-glass
- object inventory and replication
- OIDC/JWKS and role mapping
- ingress TLS/mTLS
- network-policy egress patch
- secrets manager
- Kubernetes/TES restricted execution
- projected workload token audience, issuer/JWKS, and exact execution subject verified
- approved execution publisher contract and stable output-key retry test
- version-bound input download and in-container size/SHA-256 verification test
- compute-success-with-missing-output failure test
- image signature admission
- audit sink and SIEM
- backup and disaster-recovery exercise
Software build plane
- separate GitLab project and isolated runner
- source-bundle scoped read identity
- legal approval workflow
- malware/archive safety
- approved base images
- no production credentials
- egress deny
- SBOM, provenance, scan, signature
- callback service identity
- rollback and revocation test
Data and terminology
- local-code dictionary
- LOINC mapping with method/specimen/unit constraints
- UCUM conversion library and test vectors
- standard range source/version/applicability
- precision and rounding rules
- unknown-code/unit quarantine
- amendments and duplicate policy
- genomic reference/database versions
- KG evidence-bundle conformance
- final bundle byte/hash recheck and run/instrument/build/DRS reconciliation
Validation
- approved risk assessment
- expected-result fixture manifest
- interface verification
- conversion losslessness
- analytical method validation/verification
- cross-operator and cross-lot evidence
- external proficiency where applicable
- software evidence decision
- pipeline regression
- rollback
- prospective pilot reconciliation
Security and privacy
- threat model
- privacy impact and cross-border assessment
- consent/purpose binding
- retention schedule
- penetration test
- OIDC negative testing
- execution workload identity, wrong-audience, wrong-subject, expired-token, and token-log negative testing
- PHI log scan
- secrets/key rotation
- incident exercise
- vendor cloud and subprocessor assessment
People and process
- named system owner
- instrument/profile owners
- terminology steward
- quality approvers
- security and legal approvers
- 24/7 incident contacts
- operator training and competency
- controlled SOP release
- change advisory process
- go/no-go authority
Go-live sequence
- Resolve inventory blockers.
- Connect one low-risk instrument through an approved export path.
- Run non-patient technical fixtures.
- Run reference materials and blinded reconciliation.
- Run approved prospective pilot with graph write disabled.
- Compare source, vendor report, normalised record, and clinician interpretation.
- Approve one instrument/assay/software/pipeline scope.
- Enable graph release for that scope only.
- Expand one validated scope at a time.
Signatures required
- Laboratory Director
- Quality Manager
- Clinical Safety Officer
- Information Security Officer
- Privacy/Legal
- LIM Product Owner
- Knowledge Graph Owner
- Executive Go-Live Authority