# Production Readiness

**Checklist:** PREPAIRE-LIM-GO-LIVE@3.0.0  
**Baseline status:** NOT APPROVED FOR PATIENT ACTIVATION

This checklist is fail-closed. A checked infrastructure box does not approve an assay, instrument, software build, or clinical use.

## Critical inventory blockers

- Resolve the workbook classification of Roche cobas i 601 as a mass spectrometer; physically confirm model/module, serial, software, middleware, and intended assay menu.
- Read the serials of the Sysmex urine-line modules (UC-3500 CP-SU-000001, UF-5000 CP-SU-000002, UD-10 SU-000001) and the U-WAM version; record the UD-10's room.
- Add missing serials for SCIEX ZenoTOF 8600, Sysmex XR-1000 (SRA-SXA-000001, with its IPU version), Sysmex CS-1600 (CP-SC-000001, nameplate model unresolved), and any other unassigned item before activation.
- Resolve duplicate serials, inconsistent manufacturer names, and malformed asset identifiers.
- Requalify inactive instruments before any patient run.
- Receive, install, qualify, and inventory the planned SCIEX instrument before connector activation.

## Instrument package

- physical identity photographed and reconciled
- serial, firmware, software, patch, controller/workstation, timezone
- assay/method and version
- vendor export/interface guide for exact release
- native evidence and retention/cleanup behaviour
- open derivative and converter
- service and calibration state
- operator roles
- network diagram and ports
- local extraction fixtures
- signed acceptance report
- append-only quality activation approval for exact assay/version
- append-only laboratory-director activation approval by a different identity

## LIM package

- field dictionary and pseudonym rules
- work-order state diagram
- OIDC client and mTLS
- durable outbox/replay
- event idempotency
- cancellation/quarantine
- amended result behaviour
- reconciliation report
- operational ownership and escalation

## Infrastructure

- managed Postgres, encryption, PITR, monitoring, restore test
- object bucket versioning
- compliance object lock and retention
- KMS key policy, rotation, break-glass
- object inventory and replication
- OIDC/JWKS and role mapping
- ingress TLS/mTLS
- network-policy egress patch
- secrets manager
- Kubernetes/TES restricted execution
- projected workload token audience, issuer/JWKS, and exact execution subject verified
- approved execution publisher contract and stable output-key retry test
- version-bound input download and in-container size/SHA-256 verification test
- compute-success-with-missing-output failure test
- image signature admission
- audit sink and SIEM
- backup and disaster-recovery exercise

## Software build plane

- separate GitLab project and isolated runner
- source-bundle scoped read identity
- legal approval workflow
- malware/archive safety
- approved base images
- no production credentials
- egress deny
- SBOM, provenance, scan, signature
- callback service identity
- rollback and revocation test

## Data and terminology

- local-code dictionary
- LOINC mapping with method/specimen/unit constraints
- UCUM conversion library and test vectors
- standard range source/version/applicability
- precision and rounding rules
- unknown-code/unit quarantine
- amendments and duplicate policy
- genomic reference/database versions
- KG evidence-bundle conformance
- final bundle byte/hash recheck and run/instrument/build/DRS reconciliation

## Validation

- approved risk assessment
- expected-result fixture manifest
- interface verification
- conversion losslessness
- analytical method validation/verification
- cross-operator and cross-lot evidence
- external proficiency where applicable
- software evidence decision
- pipeline regression
- rollback
- prospective pilot reconciliation

## Security and privacy

- threat model
- privacy impact and cross-border assessment
- consent/purpose binding
- retention schedule
- penetration test
- OIDC negative testing
- execution workload identity, wrong-audience, wrong-subject, expired-token, and token-log negative testing
- PHI log scan
- secrets/key rotation
- incident exercise
- vendor cloud and subprocessor assessment

## People and process

- named system owner
- instrument/profile owners
- terminology steward
- quality approvers
- security and legal approvers
- 24/7 incident contacts
- operator training and competency
- controlled SOP release
- change advisory process
- go/no-go authority

## Go-live sequence

1. Resolve inventory blockers.
2. Connect one low-risk instrument through an approved export path.
3. Run non-patient technical fixtures.
4. Run reference materials and blinded reconciliation.
5. Run approved prospective pilot with graph write disabled.
6. Compare source, vendor report, normalised record, and clinician interpretation.
7. Approve one instrument/assay/software/pipeline scope.
8. Enable graph release for that scope only.
9. Expand one validated scope at a time.

## Signatures required

- Laboratory Director
- Quality Manager
- Clinical Safety Officer
- Information Security Officer
- Privacy/Legal
- LIM Product Owner
- Knowledge Graph Owner
- Executive Go-Live Authority